Construction description:
The subject of the construction is the construction of a new production facility of the Kamax company, which is engaged in production and distribution of steel fasteners (eg screws. Construction of the whole area is planned for two stages.
The first stage deals with the construction of the production hall with the operation of heat and shape processing of wire into screws. The production is followed by storage space, packing and expedition. Furthermore, the technical rooms of the compressor room, low-voltage substations, waste water treatment plants, server rooms, ventilation and heating systems are designed. The premises also include an office building with dining room and dressing rooms on the ground floor and offices on the 2nd floor.