Repair of the Latorica river dam

  • Investor
    Slovenský vodohospodársky podnik, štátny podnik, Radničné námestie 8, 969 55 Banská Štiavnica
  • Implementation period
    5/2019 – 11/2019
  • Location
    Latorica
Construction description:

The subject of the construction is to remove the current unfavorable phenomena manifesting itself on the air side of the dam by the implementation of underground sealing walls. The building is divided into building objects:

  • SO 01 Underground wall – section A – 3 in hkm 7,200-7,300 – ie. 100m in the dike crown
  • SO 01 Underground wall – section A – 5, in hkm 8,188-8,450 – ie. 262 m at the foot of the dam
  • SO 01 Underground wall – section A – 6 in hkm 8,650-8,800 – ie. 150 m in the dike crown
  • SO 01 Underground wall – section B in hkm 9,950-10,000 – i. 50 m – in the dike crown

The construction also includes the repair of access roads.