Rokycany – infrastructure

  • Investor
    Obec Rokycany, 082 41 Rokycany 45
  • Implementation period
    04/2012 - 12/2013
  • Location
    Vranov nad Topľou
Construction description:

The subject of the construction was the improvement of the infrastructure in the village of Rokycany by the construction of a sewerage system and a wastewater treatment plant. The construction of the sewerage system itself was realized gradually according to the individual sewerage branches on which control and connection shafts were built.

The total length of the sewer itself was 3,680 m. Due to the height and directional segmentation, it was necessary to build 4 pumping stations, including connection to electricity. Part of the sewerage system was also the implementation of individual house connections, the construction of a footbridge over the Svinka River and the repair of the asphalt layer of roads. The WWTP also included the construction of an electrical connection, a well and a water connection, fencing and access road.