Construction description:
The subject of the construction is the completion of 11 buildings, which are in various stages of completion, due to the gradual financing by the investor. The building consists of:
- SO 01 Inlet to the petrol station
- SO 02 Construction part of the pumping station
- SO 03 Electrical LV connection of the pumping station
- SO 04 Feed line
- SA 06 Water tank – change no.1
- SO 07 Waterway access road
- SO 09 Waste water tank
- SO 11 Distribution network
- SO 12 Water connections
- PS 01 Technological part of the pumping station
- PS 02 Technological part of the water tank